Lamborghini

Power: 
1.1 MW
Status: 
In operation
Scope: 
Turn Key Project
Technology: 
Rooftop

 This project consists of a photovoltaic plant of 1.168 MW divided into 3 phases with solar panels on the roof of the Lamborghini factory.

The construction of this plant presented a huge technical challenge as it was necessary to implement the project without disturbing the normal activity of the factory. We had to deal with important technical constraints, respect distances and space requirements.

 The process comprises three phases:

  • Lamborghini I: construction of 120 kw.
  • Lamborghini II: construction of 938 kw.
  • Lamborghini III: construction of 110 Kw. 

This innovation allows a dual functionality: renewable energy is generated and at the same time placing the panels on the industrial cover of a car factory allows an ideal utilization of the surface. 

Multimedia